SOP Act evidentiary bar defeats bid to suspend adjudication enforcement
Aaro Group Pty Ltd v Monadelphous Engineering Associates Pty Ltd [2026] WASC 143 Tom French | Shevaun Stringer | Naoisa McNelis (more…)
Adjudicator’s failure to consider set offs constitutes jurisdictional error
Cooper & Oxley Group Pty Ltd v Koitka [2026] WASC 4 Tom French | Shevaun Stringer | Naoisa Mcnelis (more…)
Urgency tips the scales in ordering delivery of materials upon termination
Alinta Cogeneration Pty Ltd v Shanghai Electric Power Design Institute Co. Ltd [2025] WASC 455 Tom French | Naoisa McNelis (more…)
SOP Act no barrier to genuine offsetting claims for a statutory demand
Grounded Construction Group Pty Ltd v KW Civil & Construction Pty Ltd [2025] WASC 307 Tom French | Shevaun Stringer | Sasha Thomas (more…)
Adjudication or statutory demand: choose your own adventure!
Sovereign Building Company Pty Ltd v Sheehan Group Pty Ltd [2025] WASC 11 Tom French | Penny Bond | Naoisa McNelis (more…)
SOPA summary judgment: Defences not ‘under contract’ allowed
OSB Group Pty Ltd v Complete Hire & Sales Pty Ltd [2024] WASC 310 Tom French | Penny Bond | Alicia Harries (more…)
No right to elect the statutory remedy for faulty building work
Glasson and McLean [2024] WASAT 96 Tom French | Penny Bond | Lara Solomon (more…)
SOPA Summary judgment: not as ‘summary’ as you’d think
LHRE Group Pty Ltd v Complete Hire & Sales Pty Ltd [2024] WADC 61 Tom French | Penny Bond | Alicia Harries (more…)
Statutory compensation for delayed completion due to builder’s delay
Deshmukh v Distinctive Building Services Pty Ltd [2024] WASAT 62 Tom French | Penny Bond | Alicia Harries (more…)
Illustrating the differences between WA and Qld’s security notice requirements
Sun Engineering (Qld) Pty Ltd v Ravenswood Gold Pty Ltd [2024] QSC 68 Tom French | Penny Bond | Alicia Harries (more…)